Pertec AE ®

Economic Analysis Works Aiming the Reduction of Technical Losses and Loss Great Determination

 Detailed calculation of technical losses of demand and energy in each component of the delivery system for initial diagnosis:

- Realization of calculation by potency flow, with representation by phase and stretch Network, considering any imbalances;

- Realization of electric calculation at intervals of at least 60 minutes from the use of typical load curves, allowing the obtaining of loss of demand and loss of energy directly from the loss curve of each component.

 Simulation of a set of works aimed at reducing losses.

 Economic analysis of the set of simulated works aiming to identify the great losses, obtained from the execution of works financially attractive.